LGA provided master surveying services for the proposed 48-mile transmission line from Oyster Creek Nuclear Generating Station to Cedar Substation (northern phase), and from Cedar Substation to Cardiff Station (southern phase).
Our services included the following:
- GPS control for aerial mapping;
- GIS mapping, interpretation and modification;
- Base mapping including aerial topography, zoning information, township and regulatory boundaries and proposed alignment with profiles;
- Mapping for submission to the NJ Pinelands Commission and NJ Department of Environmental Protection;
- Preparation of easement and condemnation plans and documents;
- Preparation of soil erosion and sediment control plans and reports; and
- Construction layout surveying services.